ID 640555

Archived

Re-Bid - Boiler and Control Replacement, San Francisco, CA

San Francisco County

Owner Reference: 12287

Bid Date: 10/05/2022 at 03:00pm

Pre-Bid: 09/21/2022
Bidders shall meet at Lowell High School, 1101 Eucalyptus Drive, San Francisco, CA 94132

Estimate: $1,000,000

Trades: A - General Engineering Contractor GEC

The Project is generally described as, but not limited to: Removal of two (2) existing gas fired hot water boilers and existing hot water circulation pumps and its mechanical and electrical connections, installation of two (2) new gas fired hot water boilers and new hot water circulation pumps, including mechanical and electrical connections and installation of new boiler control system, in the boiler room; removal of existing boiler foundations and installation of new boiler foundations; and all associated mechanical, electrical, structural and miscellaneous related work; tests and commissioning to complete the project. Hazardous material abatement is included in the scope of work for this project. DBE goal is 3%. Bonds required. Prevailing wages.

City & County of San Francisco CA

William Chow
 (415) 355-6979
 Login or create an account To view email

Published 09/13/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.