Re-Bid: Submersible Pumps Installation for Sewer Pump Station Project, San Gabriel, CA

Los Angeles County

Owner Reference: 22-01 (Re-Bid)

Bid Date: 06/13/2022 at 03:00pm

Trades: A - General Engineering Contractor GEC, C10 - Electrical Contractor - Including Lighting and Possible High Voltage, D21 - Machinery and Pumps

The work to be done consists of furnishing all necessary labor, tools, transportation, and other incidental and appurtenant work necessary to install two new Hayward Gordon 40 HP submersible chopper pumps with quick-disconnect pump guide rail supporting systems in the wet well, including all necessary materials and piping connections from the new pumps to the existing inlet piping sections inside the wet well; removal of the two existing Gorman-Rupp pumps from the dry well; new conduits, new electrical wiring and all other necessary electrical connections from the new pumps to the new electrical control panel inside the dry well; and installation of the new liquid level pressure transducer and back-up float switch/liquid level pressure transducer for the new pumps. The new pumps shall be fully operational when the installation is completed. New submersible pumps will be provided by the City. Questions shall be in writing or email and submitted prior to 4:00 PM on June 1st. Time for completion of the work is thirty (30) working days from the actual start of the installation - construction of the project. Bonds required. Prevailing wages.

City of San Gabriel CA

Alan Mai
 (626) 308- 2825
 Login or create an account To view email

Published 05/23/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.