ID 636378

Archived

REBID Garner State Park Fiber Optic Internet Conduit Construction & Ongoing ISP, Conan, TX

Uvalde County

Owner Reference: 802-22-16821_R REBID

Bid Date: 08/23/2022 at 02:00pm

Trades: General Engineering Contractor GEC, Electrical Contractor: Low Voltage Electrical or Fiber Optic Cable Contractor (Fiberoptic) & Telecommunications

provide a proposal for fiber optic internet conduit construction and ongoing Internet Service Provider (ISP); Internet service delivery should begin at the park headquarter and branch out to the other locations from that point. Internet delivery can include, using aerial telephone/powerline poles outside the park boundary and/or boring/trenching within the park. Special coordination is necessary between the respondent and park staff to ensure all TPWD internal processes are followed to protect the cultural or archeological integrity of the park; 6.1. Technical Specifications for Internet Services; 6.2. High-speed Internet with delivery method; fiber optic or copper; 6.3. Static IP address is required.; 6.4. ISP modem/equipment must be configured for bridge or pass-through mode; 6.5. Minimum delivery bandwidth speed; 100Mbps down and 20Mbps up; 6.6. Unlimited data – no data caps or speed limitations based on usage.; 6.7. Required equipment to be in same space/closet as current network/internet equipment; 6.8. Any wireless delivery by ISP must be able to operate in tandem with existing wireless site infrastructure. Term is through 8/31/25. 4.2 This is a Re-Advertisement of this project with revised scope of work and building locations. Respondents MUST perform a site visit, even if they attend site visits for previous solicitations. Questions due 8/15/22. Bonds required.

State of Texas Parks and Wildlife TX

Vanessa Contreras
 (512) 389-4722
 Login or create an account To view email

Published 08/04/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.