Recycled Water Distribution, Santa Barbara Co., CA

Santa Barbara County

Bid Date: 02/04/2021 at 02:00pm

Estimate: $7,450,360

The Project consists of the extension of 3.19 miles of 12-inch recycled water distribution pipeline to Waller Park, the installation of a 1-million-gallon holding tank, pump station and control system, and the extension of 1,650 linear feet of 8-inch pipe to connect to the existing park irrigation system in addition to miscellaneous irrigation system changes, signing, marking and labeling. The Project also includes all ancillary stormwater control measures, endangered species mitigation measures, and other work detailed in the Project Drawings & Specs. Questions due by Jan 31st @ 11:59 PM. Substantial completion within 250 working days; final completion within 270 working days. Bonds required. Prevailing wages apply.

Laguna County Sanitation District

Kevin Thompson
 (805) 739-8756
 (805) 739-8753
 Login or create an account To view email

Published 12/16/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.