ID 546429
Archived
Queens County
Owner Reference: CI-119
Bid Date: 07/23/2020 at 10:00am
The CI-119 project consists of the replacement of the Main Sewage Pumps and other ancillary equipment and structures at the Coney Island Wastewater Treatment Plant (WWTP) in Brooklyn, New York. Work includes demolition of six existing Main Sewage Pumps (MSPs), shafts, motors, drives, and piping and replacement with vertical centrifugal dry pit pumps, 600 HP motors and eddy current drives and vertical shaft; demolition and replacement of the MSP seal water system, actuated sluice gates, sump pump system; installation of a new Flood Recovery Pump system; demolition of the decommissioned chemical storage tanks, piping, pumps and appurtenances in the chemical and dechlorination rooms; also structural, MPT, architectural, electrical, instrumentation and controls, HVAC and plumbing, and fire protection work to support the pump replacement. This project encouraged MBE/WBE participation.
Skanska
Julia Omanoff
(718) 340-0857
Login or create an account To view email
Published 07/07/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.