ID 634922

Archived

Resurface, McDonald County, MO

McDonald County

Owner Reference: 220819-G02 / FAS S604(7), (19), (20), (22)

Bid Date: 08/19/2022 at 11:00am

Estimate: $2.5M to $5M

Trades: Highway, Parking Lot, Road Improvement, Pavement Repair: Resurface Cold Mix Slurry Chip Seal - General Engineering Contractor, General Engineering Contractor GEC

Project description: Job J7S3438 Route 76 McDonald County. Resurface at intersection of Route 59, the total length of improvement being 0.254 miles. (2): Job J7S3445 Route F McDonald County. Resurface from End of State Maintenance to Route 59 in Anderson, the total length of improvement being 8.23 miles. (3): Job J7S3446 Route 59 McDonald County. Resurface from north of Rte AA in Neosho to the Arkansas State Line, the total length of improvement being 23.03 miles. (4): Job J7S3448 Route 76 McDonald County. Resurface from Oklahoma State Line to Route 43, the total length of improvement being 0.66 miles.Contract Time: 11/1/23. DBE goal 4%. Bonds required. Prevailing wages.

State of Missouri Department of Transportation (MODOT) MO

Design Division - Central Office
 (573) 751-2876
 (573) 522-2281

Published 07/19/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.