ID 635615
Archived
Shelby County
Owner Reference: CNW290 / NH/HSIP-4(12)
Bid Date: 08/19/2022 at 10:00am
Trades: Highway, Parking Lot, Road Improvement, Pavement Repair: Resurface Cold Mix Slurry Chip Seal - General Engineering Contractor, Highway, Road, Bridge, Dam, Overpass & Runway Construction - General Engineering Contractor - NAICS Code: 237310, General Engineering Contractor GEC
Project description: Resurfacing on US 78 (SR 4) From SR 176 (LM 5.34) to near I-240 (LM 7.68), including bridge deck and expansion joint repairs. Project Length - 2.340 Miles. Completion Time - on or before 6/30/2023. DBE goal 6%. Each prospective bidder and subcontractor will be required to file the “Prequalification Questionnaire” form provided on the Construction Division’s website at least 14 days prior to the date of bid opening. Bonds required. Prevailing wages.
State of Tennessee Department of Transportation (TNDOT) TN
Headquarters Construction Office
(615) 741-2414
Published 07/27/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.