ID 583351

Archived

Resurfacing SR 79, Allegheny County, PA

Allegheny County

Owner Reference: 94812

Bid Date: 05/20/2021 at 11:00am

Estimate: $30m-$34m

This is a Partial Design Build project. Design activities are limited: Traffic Control Plan and Bridge Structure For the bridge rehabilitation and preservation, sign structure rehabilitation, new sign structures, asphalt milling and resurfacing, guide rail updates, drainage, signing and pavement marking, and other miscellaneous construction, all within a length of 32,218.36 linear feet (6.10 miles) as indicated on the approved drawings included in the Bid Package for State Route 0079 Section A67, State Route 0065 Section A58, State Route 4022 Section A15, And State Route 4049 Section A07 In Allegheny County, Glenfield Borough, Kilbuck Township, Aleppo Township, Sewickley Hills Borough, Ohio Township, And Franklin Park Borough, Commonwealth of Pennsylvania. This project being situated as follows: From approximately the northern end of the Neville Island Bridge over SR 0065 at Segments 0650 NB/0651 SB Offsets 4324 NB/4448 SB (Stations 854+61 NB/SB) to approximately the SR 0079/SR 0279 interchange at Segments 0714 NB/0715 SB Offsets 0713 NB/0736 SB (Stations 621+00 NB/121+00 SB). DBE 8%. Prequalification required. Prevailing wages apply.

State of Pennsylvania Department of Transportation PA (PADOT or PENNDOT))

ECMS
 (855) 783-8330

Published 04/21/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.