ID 627964
Archived
Multnomah County
Owner Reference: RFP LC-2022-001
Bid Date: 06/03/2022 at 05:00pm
Trades: Fiber Optic Cable Service Contractor or Low Voltage Electrical Contractor
For replacement of all campus backbone fiber optic cabling on the three main campuses (College of Arts and Sciences, Graduate School, and Law Campus). This request for proposal (RFP) is for the replacement, interface connections, and testing for Lewis & Clark College’s primary fiber optic cable network. The existing fiber optic network services L&C’s core network in existing IDFs and MDFs located on all three campuses (CAS, Law, and Grad). The fiber optic network ultimately terminates in our central datacenter on our CAS campus located in the Watzek Library building. Existing fiber runs throughout main campus buildings, inside existing tunnel systems and conduits, and through building floors. The requested proposal includes, but is not limited to, the removal of existing copper or fiber and the installation of new fiber based on described needs in this proposal. Expectations are that the work performed must minimize downtime and utilize pre-existing tunnels and conduit to the greatest extent possible. All work must be completed prior to September 1, 2023 and all invoices turned in prior to May 1, 2024.
Lewis & Clark College OR
Trevor Dodson
503) 768-7222
Login or create an account To view email
Published 05/07/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.