ID 617295

Archived

RE-BID - SOQ - Design-Build Magnolia Mansion Renewal Project, Stockton CA

Stanislaus County

Owner Reference: ST-1994

Bid Date: 06/30/2022 at 02:00pm

Pre-Bid: 05/24/2022
Interested proposers should assemble in the parking lot at 612 E. Magnolia Street in Stockton, California.

Estimate: $3,984,000

Trades: B - General Contractor GC

Must be prequalified. Go to link below to apply for prequalification. The Project approximately consists of: Comprehensive renovation to restore the historic building to habitable conditions, located at University Park at the Stanislaus State Stockton Center Campus. This project will include a full replacement (new construction) of building systems, the addition of an elevator and other ADA upgrades, and a complete interior refinish. The renovated building will house administrative offices, conference rooms, and a warming kitchen. The roof was replaced in 2021. The delivery method for this Project is a modified form of the Trustees; Design-Build process, called Collaborative Design-Build. This is a two-phased project delivery process: Phase 1-Design and Preconstruction Services to define the Project, hereinafter referred to as Phase 1, and Phase 2-Design-Build New Construction Services to complete the design and construct the Project, hereinafter referred to as Phase 2. There will be separate agreements for each phase. This modified process selects the Design-Builder on qualifications and proposed fees (a design competition is not utilized).  During Phase 1 the University will issue a design and preconstruction services agreement, under which the Design-Builder will: complete the programming; develop the schematic design; commit to a guaranteed maximum price (GMP) and schedule; start Design Development; confirm other criteria are appropriate; and obtain CSU Board of Trustees (BOT) approval. Upon receipt of both the BOT approval of the schematic design and the University’s authorization to proceed, Design-Builder shall: continue with the design development; publish a set of the Design-Build Construction Documents; and establish and submit a GMP to the Trustees.  During Phase 2 the University will issue a GMP collaborative design-build agreement incorporating: the Design- Build Contract Documents; updated criteria; direct construction cost budget; GMP; contingency; remaining design fees; site management fees; payment and performance bond premiums; overhead and profit; and schedule as agreed upon in Phase 1. 3% DVBE participation.

California State University Stanislaus CSUS CA

David Sawyer
 (209) 667-3323
 Login or create an account To view email

Published 02/07/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.