ID 539466
Archived
Kern County
Bid Date: 06/18/2020 at 03:00pm
The work to be performed consists, in general, of performing the following scope of work: remove and install pumps; troubleshoot, diagnose, and correct unknown problems; disassemble, clean, repair, and reassemble all parts and components of the pumps; test run fully repaired pumps; and complete all work in a timely manner. Prevailing wages apply. Bonds may be required.
City of Bakersfield, Wastewater Division
Husain Ali
(661) 326-3249
Login or create an account To view email
Published 05/15/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.