ID 632815

Archived

RFQ: Utley Creek Water Reclamation Facility Upgrades, Holly Springs, NC

Wake County

Owner Reference: 22-010

Bid Date: 07/21/2022 at 04:30pm

Trades: Consultant, Architecture, Engineering, Consulting, General Engineering Contractor GEC

The Town of Holly Springs is soliciting proposals from qualified consultants to provide a Preliminary Engineering Report on Utley Creek Water Reclamation Facility upgrades, based on the recently completed Utley Creek Master Plan, while also exploring viable alternatives to accommodate future wastewater needs. The Town of Holly Springs intends to hire a NC Licensed Professional Engineer to provide: (1) A Preliminary Engineering Report (PER), and (2) An Alternatives Analysis (AA) to assist the Town on determining the most cost-effective and strategic path for the treatment of projected wastewater flows. Following completion of the PER and AA, the chosen candidate will provide: (3) 100% design, and (4) Construction Administration services for the upgrade project. The Town reserves the right to terminate work with chosen candidate after the completion of tasks (1), (2), (3) or (4). Questions due via email to contact above before 7/5/2022.

Town of Holly Springs NC

Rachel Ingham
 919-577-3150
 Login or create an account To view email

Published 06/24/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.