ID 603144

Archived

RFSOQ: CSU-Chico 3 Year TOCA-MEA for Several Projects, Chico, CA

Butte County

Owner Reference: 2021-04MM

Bid Date: 11/03/2021 at 03:00pm

Estimate: $30,000,000 Max Budget / $7,000,000 Per Job Max

The delivery method for this contract is Task Order-Construction Agreement for Multiple Projects—Master Enabling Agreement (TO-CA MEA). The TO-CA MEA will include two types of agreements for the multiple projects: a single task order for the design and preconstruction phase servicesfor the anticipated group of projects, and individual project construction agreements for the construction phase. During the design and preconstruction phase and under a Trusteesissued task order, the selected Respondent will collaborate with the Trustees on the design, constructability, cost, and schedule of the Project and develop a Lump Sum proposal to construct the Project. Upon the Trustees’ acceptance of the Lump Sum, the Trustees will issue a Construction Agreement to the General Contractor for the construction phase. If the Trustees and the General Contractor do not agree upon a Lump Sum, the Trustees will not award the construction phase of a Project to the General Contractor. • The Trustees’ TO-CA MEA is a three-year contract. • It is the University’s intent to award up to two (2) separate TO-CA MEAs. • The total maximum Budgeted Cost for all Projects includes all design, preconstruction and construction costs, and includes all design and preconstruction fees. • The total maximum Budgeted Cost for all Projects shall not exceed $30,000,000. • The Budgeted Direct Construction Cost for all Projects is the total cost of the work for all projects, excluding Design, Preconstruction, and Site Management fees, and Construction Overhead and Profit. • No single project shall exceed $7,000,000 in total Budgeted Cost. • Every project in this Contract is subject to prevailing wage rate laws as detailed in the Contract General Conditions; the California Department of Industrial Relations will be monitoring the projects under this Contract for payment of prevailing wage rates. • The Trustees shall not guarantee a minimum volume of Service Orders or Construction Agreements to be awarded as part of the TO-CA MEA. • The General Contractor shall be licensed in the State of California with a ‘B’ license, and the Architect on the General Contractor’s team shall be licensed to practice architecture in the State of California. Both General Contractor and Architect must be prequalified with the Capital Planning, Design and Construction Department of the CSU Office of the Chancellor. Last day to submit application for pre-qulification is 10/20/21. Questions due 10/22/21. Joint Venture Affidavit last day is 10/26/21. 

Bonds required. Prevailing wages.

California State University Chico CSUC CA

Michelle McNairn
 (530) 898-5237
 Login or create an account To view email

Published 10/04/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.