RFSOQ: Design Teams For CU Denver College of Engineering, Design, and Computing Building & North Classroom Renovations, Denver, CO

Denver County

Owner Reference: 22-103067

Bid Date: 12/23/2021 at 10:00am

Pre-Bid: 11/18/2021
UC Denver The Terrace Room Second Floor 1380 Lawrence St., Denver, CO To ensure sufficient information is available to firms preparing submittals, a mandatory presubmittal conference has been scheduled. The intent of this conference is to tour the site and to have University of Colorado Denver staff available to discuss the project. Firms preparing submittals must have at least one individual attend in person and sign in to have their submittals accepted. Due to space limitations and maintaining social distancing, General Contractors and any others that do not need to participate in-person are encouraged to attend via Zoom. A CM/GC RFP will be posted in the near future link to zoom meeting: https://ucdenver.zoom.us/meeting/register/tJckcOmgqDIqHdNKTg6PZqkN3YRlwGLcw4fi

Estimate: $61,715,000

Trades: Architecture and Engineering, General Contractor GC, Construction Management CM, Project Manager PM

Additions, Renovations & New Construction: The project will create a new complex for engineering and computing, and enhance the gateway experience into the CU Denver neighborhood along Larimer Street. The building will also serve as a cornerstone for CU Denver’s emerging open innovation district. The creation of an innovation district was one of five goals that arose from CU Denver’s 2030 Strategic Plan. Located at the intersection of Speer Boulevard and Larimer Street, this project is comprised of a 94,200 GSF new building and approximately 46,000 SF of site improvements. The project also consists of approximately 5,000 SF of renovations in the North Classroom building that will occur after completion of the new building. Should the renovation scope increase, the University may request additional services from the selected project A/E team. The University of Colorado Denver anticipates using a Construction Manager/General Contractor (CM/GC) approach to project delivery. A Guaranteed Maximum Price (GMP) and an updated project duration schedule will be established by the Architect/Engineer and the Construction Manager/General Contractor in conjunction with the University of Colorado Denver. The CM/GC will evaluate, among other things, availability of materials and labor, project schedule, project costs as they relate to the established budget, constructability, and will work closely with the Architect/Engineer and the University of Colorado Denver | Anschutz Medical Campus throughout the planning, design and construction phases of the project. Please see attached RFQ for full details on the A/E full scope of services. 

Bonds required. Prevailing wages.

University of Colorado Denver

Ben Bohmann
 (303) 724-0749
 Login or create an account To view email

Published 11/02/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.