ID 629644

Archived

Road Reconstruction, Rock Falls, IL

Whiteside County

Owner Reference: 85709 / YZ29-705

Bid Date: 06/17/2022 at 12:00pm

Trades: Highway, Road, Bridge, Dam, Overpass & Runway Construction - General Engineering Contractor - NAICS Code: 237310, Earthwork and Paving Contractor - General Engineering Contractor, Erosion Control - General Engineering Contractor, Concrete Contractor: Pedestrian Improvements, Repairs, Sidewalks, Curbs & Gutters, Driveway & Handicap ADA Ramps NIGP 913-47, Roadway Drainage, Stormwater, Manholes, Culverts: Installation, Repair & Removal - General Engineering Contractor, Pavement Marking & Striping, General Engineering Contractor GEC

This project consists of the removal and replacement of the existing pavement on Dixon Avenue from IL Route 40 (1st Avenue) to the Hennepin Feeder Canal Bridge Approach with roadway earthwork, erosion control, seeding, asphalt pavement, sidewalk, aggregate subbase, storm sewer, curb and gutter, and pavement markings. The project is located within the limits of the City of Rock Falls, Illinois (Owner). This project is located in the Southwest quarter Section 27, Township 21 North, Range 7 East of the 4th Principal Meridian. The Dixon Avenue project begins at Station 5+57.58 and ends at Station 31+97.04. The net length of the project is 2,639.46 feet (0.50 miles). Contract Time: 80 working days. DBE goal 2%. Bonds required. Prevailing wages.

State of Illinois Department of Transportation (ILDOT) IL

ILDOT
 (800) 452-4368
 Login or create an account To view email

Published 05/23/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.