ID 640281

Archived

Road Resurface, Ray & Clay Counties, MO

Ray County

Owner Reference: 221021-C01 / FAS S303(46), FAS S303(68)

Bid Date: 10/21/2022 at 11:00am

Estimate: $5M to $7.5M

Trades: Highway, Road/Parking Lot, Bridge, Dam, Overpass, Runway Repairs: Road Improvement/Pavement/Resurface/Cold Mix/Slurry/Chip Seal, General Engineering Contractor GEC

Project description: Job J3S3166 Route 210 Ray County. Resurface from the Clay/Ray County Line to West of Pendleton Road near Orrick, the total length of improvement being 2.803 miles. (2): Job J4S3337 Route 210 Clay County. Resurface from Route 210 East of 291 to Clay/Ray County Line near Missouri City, the total length of improvement being 11.958 miles. Contract Time: 11/1/23. DBE goal 9%. Bonds required. Prevailing wages.

State of Missouri Department of Transportation (MODOT) MO

Design Division - Central Office
 (573) 751-2876
 (573) 522-2281

Published 09/12/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.