ID 607342

Archived

Road Resurfacing, Lincoln & Pike Counties, MO

Pike County

Owner Reference: 211217-B02

Bid Date: 12/17/2021 at 11:00am

Estimate: $7.5M to $10M

Trades: General Engineering Contractor GEC

Job J2P3241 Route 79 Lincoln County. Resurface from Route N to 0.8 Mile North of Route C near Old Monroe, the total length of improvement being 3.77 miles. (2): Job J2P3259 Route 61 Lincoln, Pike County. Resurface northbound Lanes from Route V to 0.4 Mile South of Route UU in Pike County near Bowling Green, the total length of improvement being 25.579 miles. DBE goal is 4%. 

Bonds required. Prevailing wages.

State of Missouri Department of Transportation MO (MODOT)

Design Division - Central Office
 (573) 751-2876
 (573) 522-2281

Published 11/12/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.