ID 609059
Archived
Adams County
Owner Reference: 22-012
Bid Date: 12/16/2021 at 10:00am
Pre-Bid: 12/01/2021
If only attending this mandatory pre-proposal conference & site walk, be on site by 3:15
PM outside the front entrance and wait for the facilitator (Senior Buyer).
A mandatory site walk is first being held at Glacier Peak Elementary School (see RFP
22-011) and when completed, will then move to STEM Launch K-8. The facilitator will
determine the official start time of the mandatory preproposal conference and site walk if
the facilitator arrives after 3:15 PM.
A representative of the Offeror must attend this mandatory conference in its entirety in order
to qualify to submit an offer to this solicitation. Offerors who fail to arrive and sign the
attendance record at the pre-proposal conference within five (5) minutes of the scheduled
starting time shall be considered non-responsive and ineligible for award.
Anyone wishing to attend the pre-bid conference must have a valid government-issued
photo ID.
Wear a mask.
Trades: Roofing Contractor
Provide construction services for removal and replacement of select roof areas at STEM Launch K-8 as indicated herein. 1. Protection: Install protection necessary to prevent damage to the building and site.
2. Demolition: Remove the existing roof system at the locations identified on the drawings.
a. Remove and repurpose the existing ballast. b. Remove and discard the existing roof membrane, insulation and roof related accessories down to the concrete deck. c. Remove and recycle the existing roof related sheet metal. 3. Replacement: Install a new built-up roofing system per the drawings and specifications. a. Install new insulation. All layers to be set in hot asphalt. b. Install a new 4-ply built up roof with a gravel topping. c. Install new sheet metal counter flashing, parapet cap, roof jacks, etc.
d. Install new roof related accessories throughout. e. Install new non-combustible plywood to all walls and curbs, mechanically attached. f. Install new flashings. 4. Replacement: Install all new sheet metal and accessories throughout. a. Install new pre-finished sheet metal counter flashing, parapet cap, etc.
b. Install new galvanized sheet metal at locations that require soldering joints. Paint to
match the pre-finished sheet metal. c. Install new roof related accessories throughout.
Adams 12 Five Star Schools CO
Kelly Mickelson
(720) 972-6109
Login or create an account To view email
Published 11/27/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.