ID 614535
Archived
Jasper County
Owner Reference: J7P3532B
Bid Date: 02/18/2022 at 02:00pm
Trades: General Engineering Contractor GEC
Bridge rehabilitation on westbound lanes Over I-49 in Fidelity, the total length of improvement being 0.041 miles.
Bonds required. Prevailing wages.State of Missouri Department of Transportation MO (MODOT)
Purchasing Department
(845) 340-3408
Published 01/16/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.