ID 554555
Archived
Calaveras County
Bid Date: 10/10/2020 at 02:00pm
Pre-Bid: 09/26/2020
San Andreas Town Hall Parking Lot, #24 Church Hill Road, San Andreas 95249
This is a Public Works contract with prevailing wage requirements. Petro-Matt and Over-Lay. Blow and clean approx 20,000 sq. ft. with power blower. Spray on SS1 tack oil adhesive to approx 20,000 sq. ft. and apply on petro-matt. Pave with hot asphalt on approx 20,000 sq. ft. at 2 inches thick and compact with steam roller. Apply a new lay out on striping to parking lot. Stripe parking lines. Bonds required.
San Andreas Recreation & Park District
Donna Schantz
209.754.0127
Login or create an account To view email
Published 09/01/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.