ID 641956

Archived

San Mateo Water Extension Project, Putnam County, FL

Putnam County

Owner Reference: 22-37

Bid Date: 10/28/2022 at 02:00pm

Pre-Bid: 09/30/2022
Government Complex located at 2509 Crill Ave., Suite 200, Palatka, FL. 32177

Trades: RU - Pipeline Contractor: Water Mains, Sewer Lines, Wastewater Systems & Related Structures; possible Video Camera Inspections, CU - Pipeline Contractor: Water Mains, Sewer Lines, Wastewater Systems & Related Structures; possible Video Camera Inspections, CG - General Engineering Contractor GEC, RG - General Engineering Contractor GEC

The scope of work includes furnishing all labor, materials, equipment and other items necessary to construct and install the connections of water mains, fire hydrants, fixtures, assemblies, and appurtenances to the existing County water main as depicted in the Construction Plans. These services shall include approximately 4,262, LF of 10” PVC DR18, 20,449 LF 8” PVC DR18, 6,674 6” PVC DR18, 4,601 4” PVC DR18, 223 LF 12” HDPE DR11 as well as all applicable services, fixtures, and appurtenances as depicted in the Construction Plans. The purpose of this project is to extend Putnam County water service to the residential areas in south San Mateo, specifically south of San Mateo Road and along Dunns Creek. All lines are to be installed, tested, and disinfected per Putnam County, FAC, and FDEP specifications and guidelines. Ancillary activities include temporary erosion control measures, clearing, grubbing, sod placement, seeding, and other incidental work. The project limits extend along San Mateo Road, Sweet Gum Road, Water Oak Road, Sportsman Road, Belle Drive, Butler Drive, East Street, Gail Drive, Riverside Avenue, Sanjan Drive, Shoreline Avenue, Waterside Avenue, Waterway Avenue, Clearwater Road, Fisherman Road, Creekside Road, Paradise Circle, and Paradise Point Road. All works shall be done in conformance with all 2017 FDOT UAM, 2018 FDOT Temporary Traffic Control (MOT), Putnam County Public Works Department, and FDEP Guidelines (or newest applicable editions). In addition, construction is to adhere to FAC regulations. Project Completion Date December 1, 2023* *(360 Days from Pre Construction Meeting/Receipt of Notice to Proceed). Questions via email to Owner by 10/14/2022, 2:00pm. Bonds required. Prevailing wages.

County of Putnam FL

Leigh Doran
 386) 329-0368
 Login or create an account To view email

Published 09/26/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.