Scott Boulevard Phase II Watermain Replacement, DeKalb County, GA

Dekalb County

Owner Reference: 21-101332

Bid Date: 11/15/2021 at 03:00pm

Pre-Bid: 10/04/2021
Via Video Conference: https://dekalbcountyga.zoom.us/j/84225068964

The scope of work for this project consists of installation of 30-inch DIP Watermain and replacement of existing 8-inch distribution mains with 12” DIP inside the right-of-way and under the existing pavement. The existing 30” steel watermain and some of the 8-inch distribution mains will be abandoned in place and filled with non-shrink grout. Components also include the replacement and installation of 12-inch DIP Water main inside the right-of-way to run parallel to the 30-inch main with interconnections at specified locations. Mandatory DeKalb First LSBE Meeting: (Bidders must attend 1 meeting on either of the dates listed.) September 29, 2021 and October 6, 2021 (Meetings are held at 10:00 a.m. and 2:00 p.m.) Video Conference: Utilize the link supplied on DeKalb County webpage labeled “DeKalb First LSBE Video Meeting”. Bonds required.

County of DeKalb GA

Willie Moon
 (404) 371-7021
 Login or create an account To view email

Published 09/27/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.