ID 539862

Archived

Secondary Clarifier No 3 Project, Kent WA

King County

Bid Date: 06/16/2020 at 11:00am

Pre-Bid: 06/02/2020
Prebid meeting will consist of 2 parts: a meeting & a walkthrough at the treatment plant site

Estimate: $10.1M - $12.9M

Contractor to furnish labor, materials, equipment, tools & guarantees for the project which includes demolition, site work, construction of a secondary clarifier & return/waste sledge pump station; construction of an artesian pressure relief system well; modifications to an existing flow diversion structure & solids contract tank; replacement of existing blowers & dilution water pumps; demolition and replacement of HVAC equipment, and expansion & modification of the plant’s existing electrical, instrumentation, and SCADA control system. 420 working days.

Midway Sewer District
 (206) 824-4960

Published 05/20/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.