ID 612503

Archived

Secure Landfill Cells 11 & 12A Construction Project, Wilmington, NC

New Hanover County

Owner Reference: 338-22-0414

Bid Date: 02/17/2022 at 02:00pm

Pre-Bid: 01/04/2022
3002 Highway 421 North, Wilmington, NC

Trades: General Engineering Contractor GEC

The project will consist of landfill Cell 11 as base bid and construction of both cells (Cell 11 &12A) as a bid alternate. The construction period for Cell 11 will be 210 days from the notice to proceed to substantial completion and an additional 30 days to final completion. If the bid alternate for Cell 12A is selected, the construction period for both Cell 11 and 12A will be 270 days to substantial and an additional 30 days to final. The expansion consists of approximately 10 acres for Cell 11 & 6 acres for Cell 12A, including, but not limited to, site preparation, grading, placement of the liner system, placement of the soil cover systems, associated haul/access road, stormwater management systems, leachate collection piping, sump and pumps, electrical and control panels, and rain tarp with County coordination. If bid alternate for Cell 11 and Cell 12A is selected, the total project must be completed within 300 days of notice to proceed. Fill soil for the preparation of the subgrade and protective cover shall be supplied from on-site borrow sources and topsoil will be supplied from off-site borrow source by the contractor. DBE/MBE goal 10%. Prequalification required. 

County of New Hanover NC

Matt Brokaw
 919) 662-3015.
 Login or create an account To view email

Published 12/27/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.