ID 539551
Archived
Marin County
Owner Reference: PW 18-14
Bid Date: 06/04/2020 at 02:00pm
Estimate: $1.2M - $103M
For rehabilitation of the Shelter Bay Pump Station including replacement of the influent sewer, required demolition of the existing pump station and controls, including modifications to the existing subsurface concrete structure, construction of a valve/flowmeter pit , installation of a new motor control center and all electrical work, installation of an existing 42 kW natural gas engine generator on a new generator slab, all surface improvements, site improvements, fencing, landscaping, drainage improvements, pavement restoration, temporary controls, bypass pumping, and all other work 180 working days. Bid Additive Alternate A, includes, but is not limited to temporary pump controls and alarms, modifications to the pump control panel, temporary pump station controls, all electrical improvements, and all other work
City Of Mill Valley
Ahmed Aly
(415) 384-4755
(415) 381-1736
Login or create an account To view email
Published 05/17/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.