ID 604016
Archived
Cuyahoga County
Owner Reference: EB-2441
Bid Date: 12/01/2021 at 01:00pm
Pre-Bid: 10/21/2021
District's Environmental and Maintenance Service Center, 4747 East 49th Street, Cuyahoga Heights, Ohio
Estimate: $51.5M
Trades: General Engineering Contractor GEC
DBE MBE = 1.3% WBE = 1.0% NEORSD MBE/WBE (MBE + WBE) = 12 % NEORSD SBE SBE = 8 % In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: * A 5,100 LF soft ground micro-tunnel parallel to, and north of, the CSX railroad corridor north of Lakeside Avenue from East 40th Street to East 55th Street, where it will connect to the Shoreline Storage Tunnel Shaft SST-3. It will convey wet weather flow diverted from CSO 200. * Internal lining of 2,200 LF of brick sewer ranging in size from No. 2 to No. 10 under St. Clair Avenue and East 33rd Street. * Replacement of flow regulators generally in close proximity to the Easterly Interceptor (Regulators E-18, E-13, E-12, E-09, E-10 and E-01A/E-02A). These regulators are located from East 12th Street to Marquette Street.
Bonds required. Prevailing wages.Northeast Ohio Regional Sewer District
Steven G. Janosko
(216) 881-6600
Login or create an account To view email
Published 10/12/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.