ID 640517

Archived

Signal Upgrades, Grading, Drainage & Paving, Campbell County, TN

Campbell County

Owner Reference: CNW328 / NH-SIP-I-75-3(193)

Bid Date: 10/07/2022 at 10:00am

Trades: Traffic Signals, Control & Monitoring - Electrical & General Engineering Contractor, Excavation & Grading Contractor, Trenching, Backfill, Digging, Ditching, Rock Stabilization - General Engineering Contractor, Roadway Drainage, Stormwater, Manholes, Culverts: Installation, Repair & Removal - General Engineering Contractor, Highway, Road/Parking Lot, Bridge, Dam, Overpass, Runway Repairs: Road Improvement/Pavement/Resurface/Cold Mix/Slurry/Chip Seal, General Engineering Contractor GEC

Project description: The signal upgrades on U.S. 25W (S.R. 9) at the intersection of S.R. 116 (John McGee Boulevard) in Caryville (L.M. 32.18). Project Length - 0.104 miles. The grading, drainage, signals and paving on I-75 (U.S. 25W) at the U.S. 25W (S.R. 9) interchanges (MM 134). Project Length - 0.072 miles. Total Contract Length - 0.176 miles. Completion Time - On or before 9/30/2023. The DBE goal for this contract is 9%. Each prospective bidder and subcontractor will be required to file the “Prequalification Questionnaire” form provided on the Construction Division’s website at least 14 days prior to the date of bid opening. Bonds required. Prevailing wages.

State of Tennessee Department of Transportation (TNDOT) TN

Headquarters Construction Office
 (615) 741-2414

Published 09/13/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.