ID 572114

Archived

Silver Mountain Pump Station Improvements Project, San Antonio, TX

Bexar County

Owner Reference: CO-00405-JP/19-6008

Bid Date: 02/19/2021 at 02:00pm

Pre-Bid: 02/02/2021
Join meeting https://saws.webex.com Audio Connection: (210) 233-2550 (SAWS WebEx) Meeting number (access code): 146 742 0397 Meeting password: wuYgnfmC454

Estimate: $1,896,000

Sealed bids are requested by the San Antonio Water System for the construction of a 2 million gallon per day pre-packaged booster pump station, 0.05 million gallon welded steel ground storage tank, altitude control valve, electrical and SCADA equipment, structural foundations, canopies, miscellaneous site piping, fencing, and asphalt driveway for the Silver Mountain Pump Station Improvements Project. Bonds required. Prevailing wages. Q&A due by 02/05/21 at 5PM.

San Antonio Water System (SAWS), Contracting Office, TX

Janie M. Powell
 (210) 233-2443
 (210) 233-5351
 Login or create an account To view email

Published 01/23/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.