ID 642423

Archived

Single Point of Entry (SPOE) – Groups 4A & 4B: Fremont ES, Pio Pico ES, Century HS, Saddleback HS & Santa Ana HS, Santa Ana CA

Orange County

Owner Reference: Groups 4A & 4B

Bid Date: 11/02/2022 at 02:00pm

Pre-Bid: 10/06/2022
at each school location in the order noted below. 1. Fremont Elementary School: 1930 W. 10th Street, Santa Ana, CA 92703 2. Santa Ana High School: 520 W. Walnut Street, Santa Ana, CA 92701 3. Pio Pico Elementary School: 931 Highland Street, Santa Ana, CA 92703 4. Century High School: 1401 S. Grand Street, Santa Ana, CA 92705 5. Sadd

Trades: B - General Contractor GC

Prequalifcation required. All prequalification questionnaires will be received until October 21, 2022. To become prequalified, applications must be submitted to www.PQBids.com/SAUSD. Single Point of Entry (SPOE) – Groups 4A & 4B: Fremont ES, Pio Pico ES, Century HS, Saddleback HS & Santa Ana HS. Locations: 1. Fremont Elementary School: 1930 W. 10th Street, Santa Ana, CA 92703 2. Santa Ana High School: 520 W. Walnut Street, Santa Ana, CA 92701 3. Pio Pico Elementary School: 931 Highland Street, Santa Ana, CA 92703 4. Century High School: 1401 S. Grand Street, Santa Ana, CA 92705 5. Saddleback High School: 2802 S. Flower Street, Santa Ana, CA 92707

Santa Ana USD Unified School District CA

Etil Guillen
 (714) 480-5355
 Login or create an account To view email

Published 09/29/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.