ID 603753

Archived

Sloan Creek Lift Station, Fairview, TX

Collin County

Owner Reference: 1912-003-01 Task 05A

Bid Date: 11/02/2021 at 02:00pm

Pre-Bid: 10/12/2021
Via MS Teams. https://teams.microsoft.com/l/meetup-join/19%3ameeting_YzE2MTlkNDAtNTBmZS00MDRkLWEwMTktOThiNmFiNWMzZmYz%40thread.v2/0

Estimate: $9,000,000

This project includes construction of a new dry pit/wet well left station in the Town of Fairview including the installation of four wastewater pumps and motors with adjustable speed drive, all associated piping, odor control system, construction of a new electrical control building with electrical equipment, an emergency backup generator, generator foundation, all associated electrical, instrumentation and control work, installation of six magnetic flow meters, 8-inch water line, 18-inch and 24-inch gravity sewer, yard piping and site improvements for the Sloan Creek lift Station. Questions are due no later than 5:00 PM on October 25th. 

Bonds required. Prevailing wages.

North Texas Municipal Water District, TX

Paul Carline
 (972) 335-3214
 (972) 335-3202
 Login or create an account To view email

Published 10/10/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.