ID 640951

Archived

Somerton Heights Waterline Replacement & St Improvements, Somerton, AZ

Yuma County

Owner Reference: 2021-10, CDBG #120-22

Bid Date: 10/14/2022 at 10:00am

Pre-Bid: 09/30/2022
Conference Room, at the City Hall Building second floor, 143 N. State Ave. Somerton, Arizona 85350

Trades: A - General Engineering Contractor GEC

The project includes but is not limited to the following work within the City of Somerton, AZ: approximately 11,146 sy of pavement removal and replacement, installation of 2,172 lineal feet of 6-inch pvc waterline, fire hydrants, water services, and gate valves, tie-ins to existing water mains, and replacement of 8 existing sanitary sewer manholes. Project also includes removal and replacement of miscellaneous curb, sidewalk, sidewalk ramps, and cross gutters, and survey monuments, and other work incidental to the City of Somerton, Somerton Heights Waterline Replacement and Street Improvements project as specified in the Contract Document and Project Plans. The project shall be complete and in place within 150 calendar days from the date of Notice to Proceed. Bonds required. Prevailing wages.

City of Somerton, AZ

Samuel Palacios
 (928) 722-7371
 Login or create an account To view email

Published 09/16/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.