ID 636399

Archived

South Poplar Run Bridge Deck Rehabilitation, Greenfield, PA

Blair County

Owner Reference: 88171

Bid Date: 08/25/2022 at 11:00am

Estimate: $1m-$2.49m

Trades: Highway, Road, Bridge, Dam, Overpass & Runway Construction - General Engineering Contractor - NAICS Code: 237310

The project is for the rehabilitation of the reinforced concrete arch (Bridge 70) that carries County Road 101 (Bedford Street) over South Poplar Run, Blair County. The existing bridge is a single-span reinforced concrete arch with reinforced concrete substructure components and a bituminous deck wearing surface. The proposed project will be on the same horizontal alignment, with slight modifications to the profile to account for any changes to the structure. The proposed bridge width will be 34’-0” curb-to-curb and a 5’-0” sidewalk along both sides. The limits of the proposed roadway improvements will be the area required to construct the proposed structure and tie-in the approach roadway and other miscellaneous construction, as indicated on the approved drawings included in the bid package for State Route 7207, Section SPR in Blair County, Greenfield Township near Claysburg. DBE goal 9%. Prequalification required. Required Completion: 11/06/2023. Bonds required. Prevailing wages.

State of Pennsylvania Department of Transportation (PADOT or PENNDOT) PA

ECMS
 (855) 783-8330

Published 08/04/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.