ID 641685

Archived

SR 79 Resurfacing/Overlays, Kennedy & Robinson Townships, PA

Montgomery County

Owner Reference: 91565

Bid Date: 11/03/2022 at 11:00am

Estimate: $35m-$39.99m

Trades: Highway, Road/Parking Lot, Bridge, Dam, Overpass, Runway Repairs: Road Improvement/Pavement/Resurface/Cold Mix/Slurry/Chip Seal, General Engineering Contractor GEC

For the milling, overlay, bridge preservation, guide rail, end treatments, lighting, signs, pavement markings, highway lighting and other miscellaneous construction, all as indicated on the approved drawings for State Route 0079, Section A69, in Allegheny County, Kennedy Township and Robinson Township, Commonwealth of Pennsylvania. From approximately 0.5 miles north of the SR 60 (Moon Run) interchange at segment 0604/0605 offset 0195/0205 to the northern end of the I-79 Neville Island Bridge at segment 0650/0651 offset 0209/0225. DBE goal 8%. Prequalification required. Required Completion: 10/14/2025. Bonds required. Prevailing wages.

State of Pennsylvania Department of Transportation (PADOT or PENNDOT) PA

ECMS
 (855) 783-8330

Published 09/22/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.