ID 642169

Archived

SR 900, 68th Ave S Vicinity Pedestrian Safety – Phase 2, King Co, WA

King County

Owner Reference: 009880, F. A. Project No. 0900(033)

Bid Date: 10/19/2022 at 11:00am

Estimate:  $600,000 - $750,000

Trades: Concrete Contractor: Pedestrian Improvements, Repairs, Sidewalks, Curbs, Driveways & Handicap ADA Ramps NIGP 913-47, General Engineering Contractor GEC, Subcontractors

This is a Federally funded contract with a 18% disadvantaged business enterprise goal. Constructing cement sidewalk curb and ramp, replacing existing storm drain system, updating pedestrian push button, removing and replacing guardrail, removing pavement markings, temporary erosion control, traffic control and other work. 25 working days. Work class 1. Bonds required. Prevailing wages.

State of Washington Department of Transportation (WADOT) WA

Mike Askarian
 (206) 768-5861
 Login or create an account To view email

Published 09/27/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.