ID 631738

Archived

SR 95 SPUR MP 143.92 to 144.71, System Preservation ( Restoration / Rehab / Resurface ), Parker, AZ

La Paz County

Owner Reference: F046201C, 095-C-NFA

Bid Date: 07/08/2022 at 11:00am

Estimate: $750,000

Trades: Earthwork and Paving Contractor - General Engineering Contractor

The proposed work consists of removing the existing asphaltic concrete surface course by milling and replacing it with an Asphaltic Rubber – Asphaltic Concrete Friction Course (AR-ACFC). The project also includes spot repair work by milling and replacement with asphaltic concrete. Additional work includes replacing pavement markings and other miscellaneous work. This project is located on a Native American Reservation, in the Colorado River Indian Reservation area, which may subject the contractor to the laws and regulations of the Colorado River Indian Reservation and its TERO office. 60 working day. Bonds required. Prevailing wages.

State of Arizona Department of Transportation (AZDOT) AZ

Iqbal Hossain
  (602) 712-4398
 Login or create an account To view email

Published 06/14/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.