ID 553906

Archived

Standard Protected Bike Lane & Protected Intersection, Santa Ana,CA

Orange County

Owner Reference: 20-113

Bid Date: 09/24/2020 at 04:00PM

The City of Santa Ana (City) desires to enter into an Agreement with a qualified professional engineering consulting firm for the preparation PS&E package for Standard Avenue Protected Bike Lane and Protected Intersection Project.The proposed project will implement a Class 2 buffered bike lane along Standard Avenue from Warner Avenue to Edinger Avenue, a Class 4 protected bike lane from Edinger Avenue to Chestnut Avenue, and a Class 3 bicycle boulevard from Chestnut Avenue to 3rd Street. The project also includes a fully protected intersection at Standard and Mcfadden as well as partial protection/bulbouts at other various intersections. Signalized bicycle crossings will include separate bicycle phasing and signal heads. Pedestrian improvements along the corridor include high-visibility crosswalks and bulb outs at all crossings ant rectangular rapid flashing beacons at unsignalized crossings. The existing conditions along Standard Avenue includes 4-lane configuration segments (two northbound lanes and two southbound lanes) and 5-lane configuration segments (two northbound lanes, two southbound lanes, and a center two-way left turn lane). The majority of the corridor will be reconfigured with a road diet down to a 3-lane configuration (one northbound lane, one southbound lane, and a center two-way left turn lane) with bike lanes (as described above) in each direction. Existing uses along the project corridor includes single family and multi-family residences, schools, parks, and commercial shopping. Further by connecting to an existing bicycle network this project will provide connections to Downtown Santa Ana, Santa Ana College, Santa Ana Regional Transportation Center, and the Orange County Civic Center. The Project also includes street resurfacing, water quality improvements, and improvements at the intersections including, but not limited to: pavement, curb extensions, sidewalk, drainage and utility adjustments/relocations, signage, striping, and landscaping and irrigation where feasible. All improvements will be constructed in the Public Right of Way. Q&A due by 09/17/20 at 4pM.

City of Santa Ana, Public Works, CA

Sean Thomas
 (714) 647-5655
 Login or create an account To view email

Published 08/30/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.