ID 582994

Archived

Stem Center Bldg. 61 Third Floor, Walnut, CA

Los Angeles County

Owner Reference: 3400

Bid Date: 05/10/2021 at 02:00pm

Pre-Bid: 04/08/2021
past due.

Estimate: $1,150,000

Building 61 3rd floor rooms 3309, 3311, 3312, 3316, 3316A, 3318, 3318A, 3318B, 3318C, 3320. Remodel existing STEM CENTER to create an open space for student to be able to collaborate. Demolition of existing spaces, and remodel per DSA approved drawings work includes not limited to electrical, plumbing, and mechanical. DVBE goals. Bonds required. Prevailing wages. Q&A due by 04/20/21 at 2PM.

Mt. San Antonio College,CA

Tiffany Chen
 (909) 274-5514
 (909) 274-2025
 Login or create an account To view email

Published 04/19/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.