ID 640799

Archived

Subcontractor Opps: CM/GC SURF! Busway & Bus Rapid Transit Project, Marina, CA

Monterey County

Owner Reference: 23-02

Bid Date: 10/14/2022 at 05:00pm

Pre-Bid: 09/09/2022
Mandatory Preproposal Conference at MST of via Zoom Link MST Office 19 Upper Ragsdale, Suite 100 Monterey CA 93940 Zoom Link - PC, Mac, Linux, iOS or Android: https://us06web.zoom.us/j/81781809234?pwd=RjE0azZ uR0Y5cTl6QlVyRU9FcDQxQT09 Password: 399232. Preproposal Site Visit MST will conduct a site visit following the preproposal meeting, Proposers are highly recommended to attend: 3:00 – 4:00pm. Location 8th Street and 1st Avenue, Marina CA. Not mandatory for subcontractors.

Trades: Construction Management CM, B - General Contractor GC, Subcontractors, SEE DESCRIPTION

MST developed a regional vision for bus rapid transit (BRT) to serve its uniquely laid out service area. The first phase, the JAZZ BRT was funded with a Federal Transit Administration (FTA) award and completed nearly 10 years ago. The SURF! Project is the second phase on the region’s overall BRT network. In 2020, MST was accepted into the Project Development phase of the FTA’s Capital Investment Grants (CIG) Program for the SURF! Busway and Bus Rapid Transit project (SURF! Project). The project will consist of approximately 6 linear miles of roadway dedicated for express busway service. The route for the SURF! project would begin at MST’s Marina Transit Exchange at Reservation Road and De Forest Road in the City of Marina (northern terminus), and end at Contra Costa Street in Sand City (southern terminus). The alignment of the busway would be primarily within the Transportation Agency for Monterey County’s (TAMC’s) Monterey Branch Line rail corridor, generally located west of Highway 1 between Beach Range Road and the Monterey Peninsula Recreation Trail. Public roadways would be used for the SURF! line at both ends of the route. Given the length of the facility and its alignment, the project will be in the cities of Marina, Seaside, and Sand City, running parallel to Highway 1 next to Fort Ord Dunes State Park. Coordination between MST and the Cities of Marina, Seaside and Sand City is vital to the success of this effort. MST will work in partnership with the cities from the Request for Proposals (RFP) preparation through construction. A public and stakeholder outreach component will be required as an element of the CM/GC contractor. Questions due 9/16/22.

Monterey-Salinas Transit Authority (MST) CA

Lisa Rheinheimer, Assistant General Manager (via email)
  (831) 264-5874
 Login or create an account To view email

Published 09/15/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.