ID 641940

Archived

**Subcontractor Opportunities**Fully-Operated Equipment for Snow and Ice Control (Multi-Axle Brine Truck) Contract E, Mecklenburg, Cabarrus & Union Counties, NC

Mecklenburg County

Owner Reference: 10-00-198

Bid Date: 10/19/2022 at 02:00pm

Pre-Bid: 08/11/2022

Trades: Snow Removal - General Engineering Contractor, Subcontractors

The Contractor shall furnish to the Department of Transportation the fully operated equipment described in this contract as needed during inclement weather to perform snow and ice control activities at such time, and at such locations as directed by the Engineer. The Contractor shall furnish equipment in good operating condition and operated by properly trained and qualified personnel. The personnel operating the equipment shall be employees of the Contractor and the Contractor shall be responsible for employees during the performance of the contract. The personnel shall be subject to the directions of the Department of Transportation. The Department of Transportation may refuse delivery or may return any equipment found to be defective and/or inadequately operated. The Contractor shall conform to the guidelines as set forth in the Department of Transportation’s Snow and Ice Control Plans, policies, operational practices, use of designated chemical/abrasive storage sites, etc. Copies of this information will be provided upon request. The date of availability for this project is November 1, 2022 The date of completion for this project is October 31, 2023 with option to renew for 4 additional 1 year periods. If the anticipated MBE/WBE participation is zero, the Contractor shall make an effort to recruit and use MBE/WBEs during the performance of the contract. Any MBE/WBE participation obtained shall be reported to the Department. The Combined MBE/WBE Goal for this project is 0.0%. Prevailing wages.

State of North Carolina Department of Transportation (NCDOT) NC

Jared Mathis
 704) 983-4400

Published 09/26/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.