ID 603799

Archived

Sunrise Meadows Bike Park, Saratoga Springs UT

Utah County

Bid Date: 10/28/2021 at 03:00PM

Pre-Bid: 10/14/2021
Please join this meeting from your computer, tablet or smartphone.by following the link below: https://us02web.zoom.us/j/84385965106?pwd=cW9TTVVoU1VMbmRKUGNqNnJOaUJIQT09 Meeting ID: 843 8596 5106 Passcode: 271270 You can also dial in using your phone: (253) 215-8782

Estimate: $485,605

Major quantities of work are as follows:
• Approximately 1750 feet of asphalt and concrete trails.
• Landscaping, irrigation, and concrete pads with pavilions alongside of trails.
• Pump track inside of existing detention basin.
• Drainage upgrades to the existing detention basin.
• Coordination with Welby Jacob Water Users Company and Hansen, Allen and Luce, Inc. respective with the Welby Jacob canal.
• Bid alternate includes mountain bike trails.
Contractors must bid all Alternates associated with the Schedule(s) being bid.

Contractor must use one of the two pre-approved companies for the Mountain Bike Trail and Pump Track:

1. American Ramp Company
2. PumpTrax USA

120 working days duration.

Bonds required. Prevailing wages.

City Of Saratoga Springs Utah

Chris Klingel ext. 118
 (801) 766-6506
 Login or create an account To view email

Published 10/11/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.