ID 640954
Archived
Navajo County
Owner Reference: F056301C, 040-D-(246)T
Bid Date: 12/02/2022 at 11:00am
Estimate: $916,000
Trades: A - General Engineering Contractor GEC
The location and description of the proposed work are as follows: The proposed project is located on Interstate 40 from mile post 264.77 to 359.20. The proposed work includes the installation of Wrong Way and Do Not Enter signs on various Traffic Interchange exit ramps located along Interstate 40 and related work. The time allowed for the completion of the work included in this contract will be 115 working days. Prequalification required. Bonds required. Prevailing wages.
State of Arizona Department of Transportation (AZDOT) AZ
Iqbal Hossain
(602) 712-4398
Login or create an account To view email
Published 09/16/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.