ID 640952
Archived
Pinal County
Owner Reference: T025401C, 015-A-(217)T
Bid Date: 12/09/2022 at 11:00am
Estimate: $2,351,000
Trades: A - General Engineering Contractor GEC
The proposed project is located in Pinal County on South El Camino Viejo at Queen Creek in Queen Valley. The proposed work consists of replacing the existing bridge with a new Concrete Girder bridge, remove and replace existing Asphalt Concrete pavement, placing guardrail and other related work. The time allowed for the completion of the work included in this contract will be 220 working days. Prequalification required. DBE goal is 9.376%. Bonds required. Prevailing wages.
State of Arizona Department of Transportation (AZDOT) AZ
Iqbal Hossain
(602) 712-4398
Login or create an account To view email
Published 09/16/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.