ID 556107

Archived

Systemwide Pavement Repairs, Cook Co., IL

Cook County

Owner Reference: RR-20-4545

Bid Date: 10/06/2020 at 10:30AM

Pre-Bid: 09/08/2020
The WebEx link information will be provided via an announcement.

The scope of the work shall consist of The work under this Contract is: Asphalt Repairs: Systemwide; Asphalt Repairs: Tri-State Tollway I-294 (Northbound and Southbound Lanes) between Mile Posts 29.9 (Plaza 35) and 39.8 (Balmoral Avenue); Concrete Repairs: Systemwide). The scope of the work shall consist of Systemwide pavement repairs and patching, including, pavement removal and replacement of Warm-Mix-Asphalt, crack routing and sealing, and crack filling; and Portland Cement Concrete Pavement Patching (full depth and partial depth). Bonds required. Prevailing wages apply. Please refer to documents for details. This project encouraged MBE/WBE participation.

Illinois State Toll Highway Authority

Frank Fratto
 (630) 241-6800
 Login or create an account To view email

Published 09/15/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.