ID 605222

Archived

Terry Ranch Pipeline Design and Construction CMAR for Water & Sewer Department, Greeley CO

Weld County

Owner Reference: FK21-10-170

Bid Date: 12/03/2021 at 02:00PM

Pre-Bid: 11/02/2021
1001 11th, Avenue, 2nd Floor, Greeley, Colorado 80631

Trades: General Engineering Contractor GEC, Pipeline Contractor: Wastewater, Water Mains & Sewer Systems, May Include Camera Inspections, At Risk Construction Management CMAR

The City of Greeley is constructing a water transmission pipeline starting northwest of Windsor and installing in a northern direction in a series of construction segments. The first segment will be 6 miles starting at the connection to the Bellvue 60” water transmission pipeline northwest of Windsor to just north of HWY 14. The City of Greeley has an initial 30% design completed during the diligence period of the project. The City of Greeley is proceeding with taking the design of the first 6 miles to 100% and the remaining 27 miles of the 33 mile pipeline to 70% design. Construction of the first 6 miles is planned to begin in 2022 with completion of the entire pipeline by 2035. The City of Greeley is looking for a design consultant and contractor team to design and construct this pipeline. The consultant and contractor team will submit on the relationship, successful projects worked together, and why the team will be successful in separate proposals submitted by each.

Bonds required. Prevailing wages.

City Of Greeley CO

Shantelle Griego
 (970) 350-9794
 Login or create an account To view email

Published 10/24/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.