ID 603597

Archived

Trailhead, Parking, And Sidewalk Crossing Improvements, Construction of a Pedestrian Path And Signage at Various Locations Along Outer Belt West, Effingham, IL

Effingham County

Owner Reference: 95822

Bid Date: 11/05/2021 at 12:00pm

The project will be throughout the City of Effingham. The project will involve a Trailhead/parking improvements to be made at along Outer Belt West between Fayette and Evergreen. Sidewalk crossing improvements to connect trails at the intersection of Keller Drive and Evergreen/I57 Offramp. Other improvements will include signage and striping improvements along 4th Street/Hoffman Dr., Evergreen (East), Maple Street, Temple Ave, Willow St, Virginia St, Section St, Wasington Ave, St. Anthony Ave, Grove Ave, Shwerman St., and Wabash Ave. Includes minor improvments at intersections. DBE goal for this project is 5%. EEO requirements.

Bonds required. Prevailing wages.

State of Illinois Department of Transportation (ILDOT) IL

ILDOT
 (800) 452-4368
 Login or create an account To view email

Published 10/08/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.