ID 570820
Archived
Umatilla County
Bid Date: 02/18/2021 at 02:00pm
Pre-Bid: 02/03/2021
Anderson Perry & Associates Hermiston Office - 243 E. Main Street, Suite C, Hermiston, OR 97838
The Work consists of flattening the crest of the vertical curve on Umatilla River Road and reconstruction of approximately 1,500 feet of roadway, including the addition of a turn lane into the City of Hermiston's recycled water treatment facility, together with all other Work required to complete the Project as shown on the Drawings and specified herein. Bonds Required. Prevailing Wages
Umatilla County
Tom Fellows
(541) 278-6260
Published 01/14/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.