ID 578694

Archived

University Avenue Complete Street Phase 1, San Diego, CA

San Diego County

Owner Reference: K-21-1896-DBB-3

Bid Date: 04/29/2021 at 02:00PM

Estimate: $4,540,000.00

Installation of complete streets on University Avenue from Fairmont Avenue to Euclid Avenue including raised medians with pedestrian refuges, roundabouts, and wider sidewalks. Installation of roundabouts at University Ave/Highland Ave, University Ave/Chamoune Ave, and University Ave/Menlo Ave and remove existing traffic signals at the intersections. Installation of raised medians along University Ave from just west of Highland Ave to just east of Menlo Ave with pedestrian refuge openings with RRFBs at University Ave/45th St and University Ave/46th and a pedestrian refuge island and HAWK Beacon at University Ave/44th St. Widening of sidewalks and installation of street trees on the north and south sides of University Ave between Highland Ave and Menlo Ave. Installation of curb extensions at University Ave/Fairmont Ave (both southern corners) and University Ave/Euclid Ave (both northern corners). Upgrade existing streetlights to LED and install RRFBs at all pedestrian crossings. Installation of storm drains to connect to the existing system. Federally assisted project. DBE goal: 18% Bonds required. Prevailing wages apply. Project duration is 347 working days. Bonds required. Prevailing wages apply.

City of San Diego, Public Works Contracts, CA

Rosa Riego
 (619) 533-3426
 Login or create an account To view email

Published 03/12/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.