ID 538203

Archived

Upgrade Energy Mass Arresting System (EMAS) Project, San Diego, CA

San Diego County

Owner Reference: 411917 FC

Bid Date: 06/03/2020 at 02:00pm

Pre-Bid: 05/18/2020
Via teleconference. Dial: 619-737-2396. Conference ID: 877104530

Estimate: $2,552,700

The project provides for the removal and replacement of the existing Engineered Material Arresting System (EMAS) at the departure end of Runway 27. Questions due by May 22nd @ 2:00 PM. Bonds required. Prevailing wages apply.

San Diego County Regional Airport Authority

Frederick Sharpe
 (619) 400-2606
 (619) 400-2596
 Login or create an account To view email

Published 05/05/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.