ID 555597
Archived
Contra Costa County
Bid Date: 09/24/2020 at 02:00pm
Estimate: $577,782
Landscape renovations along the Iron Horse Trail Corridor between the Treat Boulevard pedestrian bridge and Mayhew Way, including: replacement of high water use turf areas in Walden 1 with new plantings, decomposed granite picnic and seating areas; replacement of central meadow area in Walden 2 with a variety of mulch and stone hardscape; removal of dead and dying vegetation; installation of drought tolerant plantings; trimming and mulching of existing vegetation to remain; renovation of existing irrigation systems; installation of benches, trash and recycling cans. Bonds required. Prevailing wages apply.
County of Contra Costa, Public Works, CA
Adele Ho
(510) 815-4043
Published 09/09/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.