ID 539924

Archived

Wastewater Lift Station Modeling Project, Alachua FL

Alachua County

Owner Reference: RFQ-2020-01

Bid Date: 06/08/2020 at 03:00pm

The scope of work is to provide the City with safe and responsible treatment of its wastewater. Approximately 400,000 gallons of wastewater are conveyed each day (via gravity collection mains, twenty-six (26) lift stations and force mains) to the Paul O’Dea Wastewater Treatment Facility for treatment.

City of Alachua

Donna Smith
 (386) 418-6100
 Login or create an account To view email

Published 05/20/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.